• TriConnex

£300m investment available for shovel ready, low carbon developments

If by selecting a low carbon solution such as Air Source Heat Pumps it triggers reinforcement to the electricity network, TriConnex can look to access funding which potentially will unlock your development.

Time is of the essence as we would need to get applications for the fund in by March 2021 so please get in touch.

Key points on the recently announced £300m scheme detailing how DNO’s will pay for reinforcement to enable low carbon projects are detailed here https://www.energynetworks.org/newsroom/britains-energy-networks-work-with-ofgem-to-unlock-up-to-gbp-300m-for-a-green-recovery


The ideal projects for this scheme would be:

  • Ready to go (but don’t need planning permission in place)

  • Already have a DNO connection offer which shows the reinforcement cost

  • Not have commenced (the connection offer must not have been accepted)

  • Be low carbon enabling

If there is no connection offer we need to prove there is limited capacity – which we can do through network modelling and analysis.

For more details and help, please do get in touch or email enquiries@triconnex.co.uk


107 views0 comments

Recent Posts

See All

We remain fully open for business

As with the first lockdown, our now well developed safety protocols will remain in place and we will continue to safely deliver the service you require from all of our departments. Our Operations mana

nexus.jpg

We are part of Nexus Infrastructure plc. We have been successfully delivering critical infrastructure for over 40 years.

Call Us

South East: 01376 332 680

South West: 01454 629 639

Midlands: 0116 265 1565

Email

Opening times

Mon - Fri: 8:30 - 5:30

TriConnex Ltd is a company incorporated and registered in England and Wales with company number 07466247. Registered office address is 4 Tamdown Way, Braintree, Essex, CM7 2QL. All rights reserved.

TriConnex and the TriConnex Logo are registered trademarks.

© 2019 TriConnex Ltd